Title: Level 2 High Power Rocket Build
Location: H³ Workshop 1
Date: Spring 2013
Description: LOC “Big Nuke” PK-82   H³R2
Builder: Russell Hall
Project Mission Codename: H³R2(Rocket 2)

bignukev3

With a Cesaroni Pro54 2G J280 Smokey Sam should get this rocket to 2900ft at 394mph.
But a Pro 54 6G K1440WT would get it to 5900ft at Mach 1.31
Building should start in the late winter, early spring ~ March 2013

Launch Date May 4, 2013
Launch Location at S.M.A.S.H. in Muskegon, MI


Look what Santa got me 🙂


un boxed on Christmas day 2012

2013-03-10_16-11-22_150
Starting Build March 10, 2103 – Motor tube lined up.

2013-03-10_16-46-42_760
Fillet work on the motor tube

2013-03-10_17-13-34_327
more fillet

2013-03-10_18-53-04_551
Fin #1 installed

2013-03-10_19-28-24_420
Three Fins installed, now time for fillets 🙂

2013-03-13_19-53-47_543

March 13, 2013 all of the fillets inside and outside, took one day to do a side.

2013-03-16_18-11-23_290
March 16, 2013  developed a tracking bay for my ham beacon

2013-03-16_18-26-32_193

54mm tube mounted to the front ring

2013-03-16_18-49-25_280
Rear ring install on to the tracker tube.

2013-03-17_15-41-03_49
March 17, 2013 – Tracker Tube installed into the coupler

2013-03-17_15-41-17_191

Side view of tracker bay

2013-03-17_15-57-30_159

Epoxy in the back of the ring in the coupler

2013-03-17_16-58-08_221
Tracker on shed to go into the tracker bay tube.

2013-03-17_16-58-45_927
Inside view
2013-03-17_17-13-06_129

Got the rear ring on, and the Aero Pack motor retainer jb welded on.

IMG_20130323_153055_309
March 20, 2013  nosecone mounted to the payload bay.

IMG_20130324_180740_861

March 23, 2103 yellow primer on.

IMG_20130503_174400_239

May 3, 2013 – Here is what it looks like with all of the paint and decals done..

First flight May 4, 2013 at SMASH